Progim Lean Transformation & Software

Projects

Projects

Workshop Results In The Assembly Section Of The Floor Standing Boiler Factory

assembly table
After assembly in the boiler factory

Rack Cabinet Assembly Section Workshop Results

rack-cabinet
Rack-Cabinet-Pre-assembly
Rack-Cabinet-after-assembly

«Traceability Process» Worksgop Results In The Steel Construction and Project Company

BEFORE

Yellow : 36 Process step

Red : 20 Number of problem

Green: 17 Solition offer

 

AFTER :

Yellow : 16 Process step

Red : 2 Number of problem

 

pre-traceability-1
traceability-post-2

«Warehouse Processes» Workshop Results In The Automotive Supplier Company

Warehouse Processes
Warehouse processes workshop results
Before Warehouse Processes
After Warehouse Processes

Assembly Line Workshop Results In The White Goods Company

White Goods assembly table

Yellow : Goods on the konveyor

White Goods before assembly
White Goods after assembly

5s Improvements Realized In Workshop Within One Week

kotas_before
kotas_after

Transition From Process Focused Layout To Product Focused Layout

  • Product 1 : Efficiency Increase
  • Product 2 : Efficiency Increase
  • Product 3 : Efficiency Increase
Proses odaklı yerleşim öncesi
Post-process-oriented placement

Quick Die Changing Workshop In The Press Line (Smed)

TYPE CHANGING TIME (min)
BeforeAfterIMPROVEMENT(%)
27,113,251%
Hızlı Kalıp Değiştirme

Quick Type Changing Workshop (Smed)

TYPE CHANGING TIME (min)
BeforeAfterIMPROVEMENT(%)
301453%
Kalıp Değiştirme